A December Update.

Temporary grass is getting established.
 
 
Gerald and I have begun finishing the basement ceiling. It started with this plumbing chase to hide all the pipes:
 
 
 
Then the OSB went up. Talk about work. I'm glad it was cool that day.
 
 
Gerald is all about wood work, but vanished like Harry Houdini when the paint can opened. I can't say I blame him.
 
 
Primed and starting the flat black finish. I used a glossy white finish on the walls to make them easy to clean, but it creates a lot of glare from the lights, so the ceiling should tone that down a bit.
 
 
 
Our first customer in the carpenter bee trap. They really love the wood siding, but glass is on the menu for this attempted vandal.
 
 
 
I primed a little trim:
 
 
Then I primed a little more trim. I don't want to see any more trim for a while.


More Pictures: Ladder, Laundry, Living Room

I'm staining the railing for the loft now that the ladder is in position.

Ladder in down position:


 


 
Ladder in Up (stored) position:









Finishing Touches... at least for the interior.

The aluminum railing has been installed around the back porch. It is taller than normal, but also much safer. I can lower the wood handrail to the next horizontal aluminum rail later if there's any issue. The gutters are also installed.

Before wood handrail:



With handrail installed:





I've made a loft ladder by cannibalizing a foldable attic ladder. I removed the ladder from the door frame and hinge assembly, added 2x4x10 oak boards for decoration and strength. I'll add pictures of it installed later. I was too tired to get some pictures when finished. The oak boards had to be hand chiseled to avoid the ladder's carriage bolts and washers so it could sit flush. There's probably a tool for that, but it was fairly easy to do.


 


Gutter installation ( a little humid that morning):



Garage ceiling installed. The wires are for the 3 fluorescent lights, and the receptacle is for the garage door opener. One more room, then paint white and trim...



 
Connected the downspouts to collection pipes that run under the rear driveway. A water collection and irrigation system can be added later.
 

July 2013

I know... I'm dragging this out. Progress is being made though. Most small things are being taken care of now: shelves, blinds, lights, finish woodwork, mural, etc...

A little more insulation in the basement ceiling then the ceiling and garage door can be installed.


Hopefully, I can put away the pvc glue and fittings now...


A mural for the back bedroom. I was skeptical, but it looks really nice.




A gun cabinet and/or shelving unit built in the front bedroom where the shower left some dead space. I'd hate to waste any space in a 750 sq. ft. house.


Front bedroom, looking toward front porch:


Back bedroom, looking toward back of cabin: