The Pre-Finishing Touches

There seems to be a never-ending list of small details that still need attention.

It's been a while since the last update, so here is what's been accomplished:

  • The 3/4 inch pre-finished oak flooring has been installed.
  • Baseboards are at 95%.
  • Kitchen and bathroom cabinets are in with appliances and plumbing.
  • Laundry closet is finished with ductwork, plumbing, and electrical connections ready.
  • Doorknobs installed.
  • Exterior floodlights installed.
  • Attic soffit vents installed.
  • Basement rough electrical 90%.

I know I've missed several items, but you get the picture.

I won't dare to make a list of the things still left to do.

As soon as I finish running a few wires, I can insulate the floor over the basement and install the plywood ceiling.

Adapters everywhere. Plumbing fittings are a nightmare. Nothing seems to be compatible. Here I need a 3/8 x 1/4 compression adaptor for the icemaker/water dispenser on the refrigerator. I located the little brass jewel and now have cold water available for these hot days.


The floor looks great. Everything is a mess. The countertops are just too inviting not to use as workbenches. I still have to hang the light fixtures and add some finishing touches to the bathroom, but I'm getting very close to finishing the interior.






The plumbing has been completed in the basement. I added some extra parts to satisfy the water heater warranty and for my own convenience.