Basement


5 .04.12 Finally Going Vertical.


The block mason has been hard at work. He has poured the concrete basement floor. It looks great.


I'll pour a sloped apron under the garage door to allow rainwater to flow away from the garage.




I have to haul water to the site and store it in barrels until the well drillers are able to fit me into their schedule.


Walls complete and ready for concrete fill.

The walls are all filled with concrete and we've had a few storms come through and keep it wet. The more moisture it gets during the curing process, the stronger the concrete will be.





After the concrete cures, I'll caulk the joint between the footer and block with a rubberized waterproof sealant, then apply a rubberized roll-on sealant to the top of the footer and the first block course. I'll then install a Superseal Dimpled Foundation Membrane to keep the basement dry.

http://www.superseal.ca/dimpledmembrane.html

1 comment:

  1. I'll have to ride out and look it over.It appears that the Masons have done an excellent job.
    ~Gerald~

    ReplyDelete